• RUISLIP SER

    OCL were awarded the package of works, as part of our strong relationship with SSE
  • NORTHWOOD SER

    OCL were awarded the package of works, as part of our strong relationship with SSE
  • MOORGATE LIFT SHAFT STEP FREE ACCESS

    OCL were awarded the package of works, as part of our 5 year Civils framework agreement.
  • WARREN STREET SUB MAINS

    OCL were the chosen suppler to provide between 50 – 60 qualified electricians and mates to assist the principal contractor on this project including regular full weekend station closure’s incorporated. This formed part of the ongoing investment by London Underground in upgrading the Tube Network including a complete enhanced refurbishment of Warren Street Station.
  • NEWBURY PARK STEP FREE ACCESS – CIVILS FRAMEWORK

    OCL were awarded the package of works, as part of our 5 year Civils framework agreement. This project was part of the step-free access which means lifts, ramps and level surfaces so you don’t have to use stairs or escalators, and can avoid the step and gap onto TFL trains, buses and boats.
  • UPMINSTER DEPOT – BUILDINGS FRAMEWORK

    OCL were awarded the package of works, as part of our 5 year buildings framework agreement.
  • PUDDING MILL LANE

    OCL were awarded the package of works, Consisting of 18 OLE bases as part of the Crossrail OLE enhancement project. Works crossed over both DLR & NWR infrastructure.
  • EDGEWARE ROAD SER WALKWAY

    OCL was awarded this project due to our ability to provide an all-inclusive, multi experienced team package for bespoke works.
  • UPMINSTER DEPOT UTX

    OCL were contracted to install a UTX within Upminster Depot for The Giffen Group. The UTX route was under 4 roads with associated Driver walkways for 70 meters, over a weekend possession.
  • WIMBLEDON STATION

    OCL were awarded two work packages at this particular location. The first was the installation of bespoke CMS along the underside of the platform nosing to supply a route for the new ATC cabling that would allow the new stock trains guided by sensors to stop and open there doors at the exact location as required on the associated platforms.
  • SOUTH KENSINGTON

    OCL was awarded this multi tasked project on the back of our success during the Christmas holiday period with the completion of 4 large projects originally programmed for 4 months completed in a 72 hour full possession (please also refer to Area 4 and Area 5 SUP LVAC Power Upgrade).
  • OLD DALBY TEST TRACK

    OCL was extremely proud to be awarded this particular contract as the specialist installation sub-contractor at this extremely important stage of the ATC (automatic train control) project.
  • NETWORK RAIL NLL HV FEEDER ROUTE

    OCL was recommended and requested to carry out this urgent Network Rail project in light of our ability to supply the required install teams within the limited timescales and our ability to maintain high standards within tight deadlines at the correct price.
  • AREA 4 AND AREA 5 SUP LVAC POWER UPGRADE

    The works carried out on this project was originally planned and scheduled for approximately 4 months of engineering shifts.
  • EDGWARE STATION SER

    OCL Group are contracted to install new SER buildings for the Giffen Group. These sites included a complex mass concrete underpin sub base at Edgware Road.
  • ALDGATE STATION SER & ESR

    OCL Group was contracted to install subsurface platform support foundations and utility diversions. This was to facilitate a new SER / ESR structure.
  • FINCHLEY ROAD STATION SER

    OCL Group are contracted to install new SER buildings for the Giffen Group. These sites included a complex mass concrete underpin sub base at Edgware Road.
  • NEASDEN DEPOT

    OCL has carried out a number of individual extensive packages of works at this particular location in recent years. The NDUP (Neasden Depot Upgrade Project) is a five year programme of works to allow complete improvement and regeneration over the whole depot to fully accommodate the new ‘S’ stock trains that are currently in use on parts of the London Underground system.
  • NORWICH STATION

    OCL was awarded this project due to our ability to provide an all-inclusive, multi experienced package for live platform works.
  • IPSWICH STATION SPECIALIST TEMPORARY WORKS

    OCL were contracted to install multiple specialist temporary works, for new openings within Ipswich Station structures. The works are part of the AGA station modifications.
  • VARIOUS PROJECTS

    OCL has an established reputation and excellent working relationship with all key principal contractors on London Underground network. Our personnel have, for many years, been embedded in all Civils/Electrical & General Maintenance projects and are fully embedded with the required install standards and regulations.