OCL ROLE


OCL was awarded this project due to our ability to provide an all-inclusive, multi experienced team package for bespoke works.

The works package was to install a new suspended steel walkway, around the perimeter of the new SER room. The steel supports were installed so bearing was within the new brickwork and the existing retaining wall. These penetrations had to be carefully “toothed” out, to ensure the new and existing structures were not damaged outside the area of penetration required. These areas were then repaired and re built to create an aphetically pleasing end product.

Breakdown of works undertaken on project to date;

  • Carry out all pre surveys, ground surveys and measurement modifications
  • Install structural support foundation pads
  • Install new steel supports
  • Prepare existing a new walls to receive horizontal supports
  • Install new steel bracing
  • Install new steel platforms
  • Install new steel mesh grating
  • On site modifications
  • Reinstate new and existing walls
  • Completion and submission of all required documentation for ITP


Labour Supply & Recruitment




  • Paul Mansell
    OCL have carried out many civils and electrical projects for myself for over the past 10 years within the rail sector. They deliver what is required when needed and are trustworthy therefore I have no problem in recommending them.
    Paul Mansell
    Contracts Director Fourway Communications
  • Lee Goodacre
    I would like to thank all at OCL for a great job carried out by your staff over the 52 hour week end possession at Hockley station. The Pre planning meetings and OCL's early engagement with Braybrook really helped the smooth delivery of this project. A very professional job was done right first time, with no snags, we certainly look forward to using OCL in collaboration on future projects.
    Lee Goodacre
    Managing Director - Braybrook Building and Rail and Contractors
  • Sean Gutsell
    OCL Rail in conjunction with the Giffen Group carried out a number of varied installation projects at Neasden Depot the quality of their work and collaborative approach contributed greatly to the success in delivery of the projects involved with NDUP. I would have no hesitation in recommending OCL Rail for future works.
    Sean Gutsell
    Construction Manager TFL‚ NDUP- SSR Upgrade
  •   Carl Messer
    I have used OCL for over 8 years now not only as a labour agency but also carrying out contracted price work for the Giffen Group, I have always been extremely pleased with not only the efficiency of their service but the quality of their work.
    Carl Messer
    Head of Operations LUL – Giffen Group
  • Lloyd Jenkins
    I have worked with OCL Group on several rail projects. I have been very impressed by their professional, customer orientated approach to all aspects of works. They are a contractor who consistently deliver a high quality end product at a competitive price with attention to detail and I would not hesitate to recommend OCL Group for rail related projects.
    Lloyd Jenkins
    Professional Head of Infrastructure - Old Dalby Test Track