UPMINSTER DEPOT UTX


OCL ROLE

OCL were contracted to install a UTX within Upminster Depot for The Giffen Group. The UTX route was under 4 roads with associated Driver walkways for 70 meters, over a weekend possession.

The OCL Group were able to offer experienced managers and skilled operatives to deliver the works:

BREAKDOWN OF WORKS UNDERTAKEN ON PROJECT TO DATE

  • Install complete CRMS route throughout Upminster Depot for new power containment
  • Install new power supply from sub station to depot shed
  • Install new drivers walkways with troughing routes for cable containment
  • Carry out all pre surveys, ground surveys and cat scans of areas
  • Install undertrack crossing for power supply
  • Excavate between roads
  • install progressive EWS
  • Install ducting
  • Pin duct route
  • Install concrete surround
  • Install RC capping with core warning tape
  • Reinstate track ballast
  • Kango pack the route

INSTALLATION TEAM

  • Site managers x 1
  • SPC x 2
  • Operatives x 12
  • Compliance manager-HSE auditor x 1

 