UPMINSTER DEPOT UTX
PROJECT
Upminster Depot
CLIENT
Giffen Group – LUL Depots
VALUE
£180,000
OCL ROLE
OCL were contracted to install a UTX within Upminster Depot for The Giffen Group. The UTX route was under 4 roads with associated Driver walkways for 70 meters, over a weekend possession.
The OCL Group were able to offer experienced managers and skilled operatives to deliver the works:
BREAKDOWN OF WORKS UNDERTAKEN ON PROJECT TO DATE
- Install complete CRMS route throughout Upminster Depot for new power containment
- Install new power supply from sub station to depot shed
- Install new drivers walkways with troughing routes for cable containment
- Carry out all pre surveys, ground surveys and cat scans of areas
- Install undertrack crossing for power supply
- Excavate between roads
- install progressive EWS
- Install ducting
- Pin duct route
- Install concrete surround
- Install RC capping with core warning tape
- Reinstate track ballast
- Kango pack the route
INSTALLATION TEAM
- Site managers x 1
- SPC x 2
- Operatives x 12
- Compliance manager-HSE auditor x 1